Perforert Kabel skuff Installation Guide:
01. Kabel skuff Straight (BC *) |
08. Utenfor Riser (BC * OR) |
15. horisontal justering Coupler (BC * -HAC) |
22. Wall Bracket (WB) |
02. albue 45 ° (BC * -E1) |
09. Redusering (BC * -MR) |
16. Vertikal Juster Coupler (BC * -VAC) |
23. Styrke brakett (STB) |
03. albue 60 ° (BC * E2) |
10. Right Hand Reducer (BC * -RR) |
17. Juster Riser (BC * AR) |
24. Laminert brakett (STNB) |
04. albuen 90 ° (BC * -E3) |
11. Left Hand Reducer (BC * -LR) |
18. Bolt og mutter (BN) |
25. Angle Bar Bracket (ABB) |
05. Tee (BC * -T) |
12. Divider (BC * -D) |
19. Under Floor Stand (UFS) |
26. Treaded Rod (TR) |
06. Kryss (BC * C) |
13. Bind End (BC * -Vær) |
20. Deksel Klemme (BC * -CC) |
27. Tak brakett (CB) |
07. Inne Riser (BC * -IR) |
14. Rett Coupler (BC * -SC) |
21. Rett brakett (SB) |
28. Styrking Ceiling Bracket (SCB) |