Perforert Kabel skuff Installation Guide:

01. Kabel skuff Straight (BC *) 

08. Utenfor Riser (BC * OR) 

15.  horisontal justering Coupler (BC * -HAC) 

22.  Wall Bracket (WB) 

02. albue 45 ° (BC * -E1) 

09. Redusering (BC * -MR) 

16.  Vertikal Juster Coupler (BC * -VAC) 

23. Styrke brakett (STB) 

03.  albue 60 ° (BC * E2) 

10. Right Hand Reducer (BC * -RR) 

17. Juster Riser (BC * AR) 

24.  Laminert brakett (STNB) 

04. albuen 90 ° (BC * -E3) 

11.  Left Hand Reducer (BC * -LR) 

18.  Bolt og mutter (BN) 

25. Angle Bar Bracket (ABB) 

05.  Tee (BC * -T) 

12. Divider (BC * -D) 

19.  Under Floor Stand (UFS) 

26.  Treaded Rod (TR) 

06.  Kryss (BC * C) 

13. Bind End (BC * -Vær) 

20.  Deksel Klemme (BC * -CC) 

27.  Tak brakett (CB) 

07.  Inne Riser (BC * -IR) 

14. Rett Coupler (BC * -SC) 

21.  Rett brakett (SB) 

28. Styrking Ceiling Bracket (SCB)